
Public Inquiry: Land off Fishbeck Lane, Silsden (Horn Crag Quarry)
Pre-App and Application Documents and Plans
- 01-01 Pre-Application Submission.pdf (5 Mb)
- 01-02 Pre-App Response from BMDC 18-08-20.pdf (500 Kb)
- 01-03 Screening Request.pdf (1 Mb)
- 01-04 Screening Response from BMDC.pdf (277 Kb)
- 01-05 Covering Letter.pdf (253 Kb)
- 01-06 Planning Application Form.pdf (4 Mb)
- 01-07 Non-technical Summary.pdf (368 Kb)
- 01-08 Supporting Statement.pdf (728 Kb)
- 01-09 Flood Risk Assessment.pdf (353 Kb)
- 01-10 Dust Management Scheme.pdf (311 Kb)
- 01-11 Schematic Restoration Scheme.pdf (313 Kb)
- 01-12 Hydrogeological Risk Assessment.pdf (2 Mb)
- 01-13 Noise Impact Assessment.pdf (3 Mb)
- 01-14 Landscape and Visual Appraisal.pdf (6 Mb)
- 01-15 Transport Statement.pdf (1 Mb)
- 01-16 Heritage Stone Survey.pdf (6 Mb)
- 01-17 Preliminary Ecological Agreement (Redacted).pdf (2 Mb)
- 01-19 Breeding Bird Survey.pdf (1 Mb)
- 01-20 Breeding Bird Survey Update.pdf (5 Mb)
- 01-21 SPA Bird Foraging Surveys.pdf (774 Kb)
- 01-24 Bat Activity Survey.pdf (1 Mb)
- 01-25 Bat Emergence Survey Report.pdf (1 Mb)
- 01-26 Bat Survey Update - Hiberation Report.pdf (1 Mb)
- 01-27 Reptile Survey.pdf (1 Mb)
- 01-28 Arboricultural Impact Assessment and Tree Survey.pdf (1 Mb)
- 01-29 Detailed Vegetation Survey.pdf (3 Mb)
- 01-30 Biodiversity Net Gain Assessment.pdf (4 Mb)
- 01-31 Dust Assessment.pdf (1 Mb)
- 01-32 Dust Management Scheme.pdf (312 Kb)
- 01-33 Ecological Impact Assessment (Redacted).pdf (1 Mb)
- 01-35 Location Plan.pdf (4 Mb)
- 01-36 Extraction Boundary (00-02 Key Drawings).link
- 01-37 Extraction Phasing Plan (00-03 Key Drawings).link
- 01-38 Site Layout (00-04 Key Drawings).link
- 01-39 Footpath Diversion.pdf (296 Kb)
- 01-40 HGV Routing.pdf (415 Kb)
- 01-41 Schematic Restoration Scheme Features (00-05 Key Drawings).link
- 01-42 Restoration Scheme Aerial (00-06 Key Drawings).link
- 01-43 Restoration Scheme Aerial with Redline (00-07 Key Drawings).link
- 01-44 Restoration Phasing (00-08 Key Drawings).link
- 01-45 Photomontages Locations 2 and 4.pdf (421 Kb)
- 01-46 Photomontages Locations 8 and 14.pdf (346 Kb)
- 01-47 Photomontage Location 16.pdf (293 Kb)
- 01-48 Site Preperation Plan.pdf (9 Mb)
- 01-49 Existing Topo Northern Half.pdf (1 Mb)
- 01-50 Existing Topo Southern Half.pdf (1 Mb)
- 01-51 Quarry Design.pdf (3 Mb)
- 01-52 Quarry Design Cross-Sections.pdf (973 Kb)
- 01-53 Restoration Design.pdf (1 Mb)
- 01-54 Restoration Design Cross-Sections.pdf (1 Mb)
- 01-55 Groundwater Levels.pdf (1 Mb)
- 01-56 Appendix A – Groundwater Level Monitoring Data.pdf (153 Kb)
- 01-58 Resubmission Addendum.pdf (310 Kb)
- 01-59 Statement of Community Involvement.pdf (1 Mb)