Public Inquiry: Land off Fishbeck Lane, Silsden (Horn Crag Quarry)

Pre-App and Application Documents and Plans

acrobat icon 01-01 Pre-Application Submission.pdf 5 Mb
acrobat icon 01-02 Pre-App Response from BMDC 18-08-20.pdf 500 Kb
acrobat icon 01-03 Screening Request.pdf 1 Mb
acrobat icon 01-04 Screening Response from BMDC.pdf 277 Kb
acrobat icon 01-05 Covering Letter.pdf 253 Kb
acrobat icon 01-06 Planning Application Form.pdf 4 Mb
acrobat icon 01-07 Non-technical Summary.pdf 368 Kb
acrobat icon 01-08 Supporting Statement.pdf 728 Kb
acrobat icon 01-09 Flood Risk Assessment.pdf 353 Kb
acrobat icon 01-10 Dust Management Scheme.pdf 311 Kb
acrobat icon 01-11 Schematic Restoration Scheme.pdf 313 Kb
acrobat icon 01-12 Hydrogeological Risk Assessment.pdf 2 Mb
acrobat icon 01-13 Noise Impact Assessment.pdf 3 Mb
acrobat icon 01-14 Landscape and Visual Appraisal.pdf 6 Mb
acrobat icon 01-15 Transport Statement.pdf 1 Mb
acrobat icon 01-16 Heritage Stone Survey.pdf 6 Mb
acrobat icon 01-17 Preliminary Ecological Agreement (Redacted).pdf 2 Mb
acrobat icon 01-19 Breeding Bird Survey.pdf 1 Mb
acrobat icon 01-20 Breeding Bird Survey Update.pdf 5 Mb
acrobat icon 01-21 SPA Bird Foraging Surveys.pdf 774 Kb
acrobat icon 01-24 Bat Activity Survey.pdf 1 Mb
acrobat icon 01-25 Bat Emergence Survey Report.pdf 1 Mb
acrobat icon 01-26 Bat Survey Update - Hiberation Report.pdf 1 Mb
acrobat icon 01-27 Reptile Survey.pdf 1 Mb
acrobat icon 01-28 Arboricultural Impact Assessment and Tree Survey.pdf 1 Mb
acrobat icon 01-29 Detailed Vegetation Survey.pdf 3 Mb
acrobat icon 01-30 Biodiversity Net Gain Assessment.pdf 4 Mb
acrobat icon 01-31 Dust Assessment.pdf 1 Mb
acrobat icon 01-32 Dust Management Scheme.pdf 312 Kb
acrobat icon 01-33 Ecological Impact Assessment (Redacted).pdf 1 Mb
acrobat icon 01-35 Location Plan.pdf 4 Mb
01-36 Extraction Boundary (00-02 Key Drawings).link
01-37 Extraction Phasing Plan (00-03 Key Drawings).link
01-38 Site Layout (00-04 Key Drawings).link
acrobat icon 01-39 Footpath Diversion.pdf 296 Kb
acrobat icon 01-40 HGV Routing.pdf 415 Kb
01-41 Schematic Restoration Scheme Features (00-05 Key Drawings).link
01-42 Restoration Scheme Aerial (00-06 Key Drawings).link
01-43 Restoration Scheme Aerial with Redline (00-07 Key Drawings).link
01-44 Restoration Phasing (00-08 Key Drawings).link
acrobat icon 01-45 Photomontages Locations 2 and 4.pdf 421 Kb
acrobat icon 01-46 Photomontages Locations 8 and 14.pdf 346 Kb
acrobat icon 01-47 Photomontage Location 16.pdf 293 Kb
acrobat icon 01-48 Site Preperation Plan.pdf 9 Mb
acrobat icon 01-49 Existing Topo Northern Half.pdf 1 Mb
acrobat icon 01-50 Existing Topo Southern Half.pdf 1 Mb
acrobat icon 01-51 Quarry Design.pdf 3 Mb
acrobat icon 01-52 Quarry Design Cross-Sections.pdf 973 Kb
acrobat icon 01-53 Restoration Design.pdf 1 Mb
acrobat icon 01-54 Restoration Design Cross-Sections.pdf 1 Mb
acrobat icon 01-55 Groundwater Levels.pdf 1 Mb
acrobat icon 01-56 Appendix A – Groundwater Level Monitoring Data.pdf 153 Kb
acrobat icon 01-58 Resubmission Addendum.pdf 310 Kb
acrobat icon 01-59 Statement of Community Involvement.pdf 1 Mb

Stay Connected

Sign up for email updates about planning and building control

Your email